Galaxy Aqua Premier Installation Manual Better -

Ensure the assembly is easily reachable for future filter replacements. Step 5: Connect the Tubing (The "Color-Coded" Key)

Connect the line running up to your newly installed Chrome Faucet. System Start-Up and Mandatory Flushing

A high-performance system like the Galaxy Aqua Premier requires precise installation. A poorly installed system can lead to: Reduced water pressure. Leaking components. Premature filter failure. Ineffective contaminant removal. galaxy aqua premier installation manual better

Turn on the cold water supply valve under the sink, then open the Feed Water Adapter Valve to allow water into the system.

during installation. This is a critical "interesting" feature for those in older buildings with lower electrical capacity or for summer use where 9.5kW might be overkill. Orientation Constraints Ensure the assembly is easily reachable for future

Before starting, ensure your site meets these technical requirements: Water Supply : Must be a mains cold water supply with a minimum running pressure of (15 psi) at a flow rate of 8-9 litres/minute. Electrical Rating : For the 9.5kW model, 10mm² wiring is recommended to handle the high current safely. Positioning

Mark fixing holes using the backplate. The top-fixing hole is a "key-hole" slot; tighten this screw first (leaving 10mm head protrusion), then hang the unit. This makes aligning the bottom holes much easier. Flush the Pipes: Crucial Step. A poorly installed system can lead to: Reduced

Use the Galaxy Aqua manual alongside this guide to verify part names. 5. Troubleshooting Common Issues

Connect the live, neutral, and earth wires to the terminal block after plumbing is complete.

Connect the T-valve water source to the Inlet port of the external pre-filter.